Defence
Robertson Barracks
Construction of new buildings including aircraft hangers, this project involved installation of the following:
- 550 cat 6 outlets Approx
- 12 x 45RU cabinets
- 12 x 12c MMOF links to cabinets
- 12 x 50pr copper links to cabinets
- 6 x 12c SMOF link to into existing Optic Fibre network
- 6 x 100pr copper link to into existing copper network